Northern Gold Coast · QLD 4209
The northern growth engine — a new 600-bed hospital, the Coomera Connector and Westfield town centre.
* Sample market figures for layout testing — live Domain data is wired in before launch.
18 major approvals in the pipeline — significant new supply could soften rents short-term before population absorbs it.
A new ~$2.25 billion public hospital on George Alexander Way delivering at least 600 beds across two stages (400 then 200), with major construction ramping up in late 2026 and the first beds opening in 2031.
A private hospital campus on Foxwell Road near the M1 and Coomera Station — the first stage of the ~$1.5 billion 'Foxwell Coomera' masterplan originally proposed by developers Keylin & Kinstone in 2023. Construction is now underway on medical consulting suites, allied health and day surgeries targeting early 2028, ahead of future overnight hospital stages.
A ~$2.16 billion, 16km motorway (M9) east of the M1 between Coomera and Nerang, with the northern section opened in December 2025 and remaining packages opening to 2027.
The next 4.9km northern section of the Coomera Connector, with detailed design funded to start in early 2026.
Leda Holdings (Bob Ell) paid $177 million — believed to be the biggest land sale in Gold Coast history — for a 161ha infill parcel at Cunningham Drive and George Alexander Way. The site carries approval for a masterplanned community of around 4,200 homes (house-and-land, townhouses and apartments) plus five neighbourhood centres, close to the future Coomera hospitals and the Coomera Town Centre.
A 54ha industrial and mixed-use estate on Old Pacific Highway between Coomera and Pimpama (formerly branded 'The Link Coomera'), acquired by Metrics Credit Partners and Vitale Property Group for $120 million, permit-ready for a 46-lot staged subdivision. Council's register shows staged civil works, landscaping and retail approvals (including a large-format pharmacy) progressing through 2025 — the visible construction along the corridor.
A 680-hectare master-planned town centre around Coomera railway station, approved in 2012 and still being progressively implemented. Capacity for around 25,000 dwellings and 50,000 residents, anchored by a Scentre Group/QIC retail centre plus planned university, hospital and higher-density residential.
A Material Change of Use application for a 178-apartment development located at 215-233 Foxwell Road, Coomera.
Reconfiguration of land at Albert Street, Coomera into a 110-lot residential subdivision as part of the Coomera Foreshore stages 15-22 development.
Reconfiguration of a lot to subdivide two existing parcels into 111 residential lots located at 566 Foxwell Road, Coomera.
A Material Change of Use application for a 157-unit multiple dwelling development located at 215-233 Foxwell Road, Coomera.
A significant Material Change of Use application for a comprehensive residential project featuring apartments, attached dwellings, and medium density housing along with public parkland.
Combined application for Material Change of Use permitting 186 residential units across two lots, with associated lot reconfiguration, new road infrastructure, and temporary access easement. Development follows prior approval (COM/2023/16).
Large-scale residential subdivision creating 179 lots across staged development (Stage 1: 58 civil lots). Combined application for lot reconfiguration and operational works including public and private landscaping.
Material Change of Use application for a large-scale mixed-use development comprising 720 residential dwellings, restaurant, retail shop, indoor recreation facility, and medical centre on Lot 502 Urbana Boulevard. This represents a significant urban consolidation project in the Coomera growth corridor.
A change application filed for a four-tower project at 215-233 Foxwell Road, Coomera, seeking to increase towers to 16-25 storeys (72-97m) — a 17-level increase over the prior approval — adding 350+ homes for a total of 720+ units.
A reconfiguration of one lot into 43 residential allotments plus two open space lots located in Coomera.
A combined development application for a 24-lot subdivision and 6 dual occupancy dwellings at 54 George Alexander Way.
A development application for a Material Change of Use to construct 73 multiple dwellings at 80 Cunningham Drive North, Coomera.
CFMG Capital acquired 3.3-hectare development site at Upper Coomera for $17 million to develop 63-lot residential community. Development Approval reconfiguration is being pursued with council, project expected to launch publicly within months and civil works anticipated to commence later in 2026.
Material Change of Use application for warehouse development on Pacific Highway, a major arterial corridor in Coomera. The MCU assessment indicates conversion or repurposing of the site for warehouse/logistics use.
Combined operational and building works application involving major civil infrastructure (water, sewer, stormwater) and associated building works at 240 Foxwell Road. This is a significant infrastructure project indicating substantial development activity in the precinct.
The expansion of the Coomera Private Hospital at Foxwell Road signifies a major investment in regional health infrastructure. Large-scale medical facilities act as significant employment hubs, driving long-term rental demand from healthcare professionals and attracting further surrounding development to the suburb.
The development of a hospital in Coomera is a significant catalyst for the local property market, as it drives high-value medical employment and increases regional infrastructure importance. Such facilities often attract ancillary medical services and residential demand from healthcare professionals, typically supporting long-term capital growth in the immediate catchment.
A new 3,780sqm Woolworths anchoring a new shopping centre confirms the Upper Coomera catchment has reached major-supermarket population thresholds.
Coomera has 4 active infrastructure projects, headlined by New Coomera Hospital (under construction). Investment spans hospital, transport. The median house price is around $820k, with auction clearance strengthening and days on market falling; gross rental yield is about 4.46%.